<em id="aepuz"><em id="aepuz"></em></em>
      <strong id="aepuz"><dl id="aepuz"></dl></strong>
        Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

        Aluminum alloy sacrificial anode

        magnesium anode, zinc anode

        Telephone:

        0391-7588881 +8618739187123

        Jiaozuo Libo Light Alloy Co., Ltd.

        News

        News

        Contact

        Phone:18739187123

        hotline:0391-7588881

        E-mail:970512272@qq.com

        Address:Wuzhi County, Jiaozuo City, China

        Industry News

        Collection instrument intelligent potential test pile manufacturer

        • Author:Libo
        • Source:wwww.gofitnessfreak.com
        • Date:2021-06-11
        • Click:0

        Chapter 1 Product Introduction

        1.1 an overview of the

        The product is a waterproof measurement and control device, using high-performance lithium battery power supply (solar power supply system), can collect signals and remote transmission data through GPRS, especially suitable for no power supply conditions, harsh environment monitoring site.

        1.2 Product Features

        L Integrated design of data acquisition and transmission.

        L Support battery (solar powered).

        L IP68 protection grade, waterproof, moisture-proof, anti-immersion.

        L Supports serial port, remote setting of working parameters, and onsite viewing of data.

        1.3 Product Functions

        L Communication function: support GPRS full network communication 4G signal communication mode; Support data communication with multi-center;

        L Working mode:

        [Outage potential detection] Supports outage potential collection with configurable time, and the collection interval is adjustable from 30 to 999ms;

        [Standard potential collection] The standard collection can be periodically awakened once a day according to the conventional configuration, and upload once within the configuration period.

        [Continuous potential collection] Support the longest continuous 24 hours of continuous collection mode, the minimum sampling interval is 10s; According to the control instruction, the monitoring and collection can be started and ended. If the power potential of the monitoring and collection does not exceed the set alarm value, the monitoring and collection can be collected and uploaded once in 5 to 10 minutes; if the power potential of the monitoring and collection exceeds the set alarm value, the monitoring and collection can be collected and uploaded once in 1 to 5 minutes. .

        L Collection function: support the collection of energized potential, power off potential, natural potential, AC potential, DC current, AC current.

        L Remote management function: support remote parameter setting, program upgrade.

        L Intrusion alarm function: in case of intrusion, the device will wake up and send alarm information immediately.

        L Storage function: this machine circulates the storage of monitoring data, power failure is not lost.

        L External power supply function: provides EXTERNAL DC power supply

         

        1.4 Technical Parameters

        L Hardware configuration: Six AI's and one RS485 serial port

        Additional information about one RS485 serial port:

        Used to modify device parameters in local configuration.

        L Communication error code: ≤10-6.

        L Storage capacity: 16 MB

        L power supply: 6 to 9DC.

        L Communication mode: GPRS full network communication 4G signal.

        L Battery life: > 5 years (collect and send once a day).

        L Power consumption: dormancy current ≤20uA/9V;

        L Installation: buried/wall mounted.

        L Overall size: 160x100x60mm

        1.5 Indicator Description

         

        Only externally awakened

        100ms bright,100ms destroy

        Conventional standard acquisition

        500ms bright,500ms destroy

        Electricity acquisition

        1000ms bright,1000ms destroy

        Continuous acquisition

        2000ms bright,2000ms destroy

        Monitor of

        3000ms bright,3000ms destroy

        Network communication

        250ms bright,250ms destroy

        The invasion of

        1000ms bright,100ms destroy

        Enter the configuration

        Normally on

         

         

         

         

         

        1.5.3 Internal Wiring Terminals

        From left to right are

         

         

         

         

        identifier

        Said Ming

        V+

        Positive power input

        V-

        Negative power input

        P201+

        External power supply +

        P201-

        External power supply -

        DI600+

        The intrusion is triggered after short-circuiting

        DI600-

        DI600+

        Only the device is woken up after the short-circuiting

        DI600-

        A

        RS485-A

        B

        RS485-B

        DO600

        The reserved

        DO600

        DO601

        The reserved

        DO601

        T

        Try 2 end

        G

        zero

        C

        The reference end

        Z

        The specimens 1 side

         

         

         

         

        Chapter 2 Precautions Before Installation

         

         

         

         

         

         

         

         

         

        2.1 an overview of the

        Jr-gprs intelligent potential acquisition instrument must be correctly installed and configured to achieve the designed function, in order to ensure the correct installation, please read this manual carefully.

        Notes:

        L Do not install with power on.

        L Ensure that GPRS signals are normal at the installation site.

        2.2 out of the

        For safe transportation, measurement and control terminals usually need reasonable packaging. When unpacking, please take good care of the packaging materials for future use.

        The package consists of the following components:

        L JR-GPRS intelligent potential acquisition instrument 1 (the quantity is packed according to the order situation of the user)

        L Sucker antenna or waterproof antenna 1 (the quantity is packed according to the order)

        1 set of battery box or solar cell box (the quantity shall be packed according to the order of the user)

        L Spare parts, documents 1 set

         

        After unpacking, please check the quantity of the items. The specific quantity is consistent with the order contract. If damaged, lost, or parts are inconsistent, please contact the manufacturer in time.

         2.3 Installation Methods

        2.3.1 Installing required Tools

        One small flat-head screwdriver and one Cross screwdriver

        1 serial computer (for serial port Settings)

        Waterproof sealant right amount

        Butter a moderate amount of


        2.3.2 Installation method, installation dimensions, and installation Diagram

        Installation: wall-mounted installation (buried installation)

        Dimensions: 160mm×100mm×60mm

        Mounting size: 146mm×64mm (aperture R = 4.5mm)

        Chapter iii Installation of parameter software and setting of basic parameters


        3.1 Parameter This section describes how to install and use the software

        3.1.1 Parameters This section describes the software version and installation environment

        Jr-gprs intelligent potential acquisition instrument must be set before use, parameter setting needs to use the standard parameter setting software of Qingdao Jinran Company.

        3.1.2 Parameter This section describes how to install the software

        (1) After decompression, double-click JR-GPRS customer version. Exe to directly run and open the software

         

         

         

         

        3.2 Description of the Parameter software

        3.2.1 Opening the Serial Port and Creating a Configuration File

        (1) Before using the software, ensure that the computer is connected to the serial port of the device.

        (2) Open the serial port, click the system button under serial port configuration, select the corresponding serial port, and click open

         

         

        (3) Create a configuration file to store device configuration parameters. Right-click the blank area on the left, select Add Collector, enter a. Dat file, and click the create button.

         

         

         

        3.2.2 Loading the Configuration File and Configuration

        3.2.2.1 Loading the Configuration File

        (1) Double-click the newly created configuration file to load the file to the interface.

         

        3.2.2.2 Device Configuration - > The primary configuration

         

        (1) Device Code: unique identifier of the device, 10 digits

        (2) Server 1IP and Port: IP address and port connected to server 1

        (3) SERVER 2IP and Port: IP address and port connected to server 2

        (4) Standard collection time: the time point at which the equipment collects every day. For example, 16:45 means that the equipment collects at 16:45 once.

        (5) Start upload and end upload: During the period of start upload and end upload, each device will find a random time point to upload data.

        (6) Intrusion alarm: configure whether to enable the intrusion alarm function on the device. When it is invaded, the device will immediately send alarm information to the network end.

        (7) Primary modification button: After the parameters are modified, click the primary modification button, and the configuration information in the current interface will be saved in the configuration file.

        3.2.2.3 Device Configuration - > Advanced configuration

         

        (1) Configuration of power-off status collection: Collection period range (30~999ms) indicates the collection interval for power-off status collection. Collection Duration: duration when breakpoint collection is triggered. Collection time: the time when stop-mining collection is triggered. For example, 01 00:00 indicates the time-sharing triggered power-off collection at 0 ∶ 0 on the 1st; Valid identifier: indicates whether the configuration of stop-mining status collection is enabled.

        (2) Configuration of continuous status collection: Collection Period indicates the interval of continuous collection when continuous collection is triggered.

        (3) Monitoring status collection configuration: low alarm indicates the alarm lower limit of energized potential, such as 3000 indicates 3V; High alarm indicates the alarm upper limit value of galvanic potential, such as 3000 means 3V; Normal collection cycle range (5~10 minutes) indicates the collection cycle interval used by the monitoring mode when the power potential does not exceed the alarm set value during the monitoring collection; Alarm collection cycle range (1~5 minutes) : indicates the collection cycle interval used by the monitoring mode when the power potential during monitoring collection exceeds the alarm set value;

        (4) Advanced modification button: After clicking the advanced modification button, the configuration parameters of the current interface will be saved in the configuration file.

        3.2.2.4 Configuring Parameters to the device

        (1) Configuration file delivery: Double-click the configuration file to be delivered, and right-click the configuration item to be delivered. The basic and advanced configurations are delivered to the device.

         

        (2) Calibration: right-click the blank area, select the acquisition instrument calibration, and click the "Confirm" button to calibrate the equipment

         

        (3) After each configuration, delete the historical data of the device by right-clicking the blank area and selecting Clear Historical Data

         

        (4) Click Restart to complete the configuration of the device.

        3.2.3 Sampling Using the Local Configuration Tool

        (1) After selecting the sampling bar, the collection of each sample value can be tested on this page.

         

        3.2.4 Local Upgrade

        (1) Right-click in the blank area on the right, select program Upgrade, select the file to be upgraded in the pop-up interface, click the Upgrade Start button, and wait for the upgrade to be completed.

         

         

         

         

        Chapter 4 Solutions to common problems

        4.1 Common Fault Analysis and Handling Measures

        The serial number

        The fault phenomenon

        Possible reasons for

        Treatment measures

        1

        串口無(wú)法設(shè)參

        Battery cause.

        Check whether the battery terminal is properly inserted, whether the polarity is correct, and whether the battery is powered.

        The serial cable is incorrectly connected.

        Check whether the serial port is properly connected. The device is directly connected to the computer through a serial port and inserted into the debugging serial port of the device.

        The computer serial port is incorrectly selected.

        Check whether the serial port of the computer is correctly selected in Software Configuration Tools.

        The serial port cable may be faulty.

        Check whether the serial port connection cable is disconnected, short-circuited, or in poor contact.

        The smart potentiometer didn't wake up.

        If the intelligent potentiometer is in hibernation state, the device can be awakened by short-circuiting the wake end.

        The serial port of the intelligent potentiometer is faulty.

        Contact the manufacturer.

        2

        未定時(shí)啟機(jī)

        The battery is not installed properly.

        Check whether the battery terminal is properly inserted.

        The interval between reporting and collection is incorrect.

        Check whether the reporting interval is set correctly.

        Not when the school

        Check whether the time baseline is set correctly.

        3

         

         

         

         

        不上網(wǎng)

         

         

         

         

         

         

         

        不上網(wǎng)

         

         

        The SIM card is not properly inserted or the antenna is not properly connected.

        Check whether the SIM card is correctly inserted and whether the antenna is properly connected. Tighten the antenna connection.

        The device position signal is poor.

        To check the signal strength at the position of the intelligent potential collector, adjust the antenna position to keep the signal strength of the intelligent potential collector in the best state.

        The device parameters are incorrectly set.

        Check whether the access point and network transmission mode of the intelligent potential collector are set correctly.

        The SIM card is overdue.

        Pay for the card.

        The REQUIRED function of the SIM card is disabled.

        Confirm with the mobile company whether this function is enabled on this card.

        The SIM card is defective.

        Insert the SIM card into the phone and check the SIM card quality.

        The battery is low.

        Replace the battery that meets the requirements.

        The device hardware is faulty.

        Contact the manufacturer.

        The parameters of the intelligent potentiometer are incorrectly set, such as the local number, port number, access point, and remote number.

        Check whether the parameters of the intelligent potential collector are correctly set and whether the access point, port number, and remote number are correctly added.

        Special line

        The IP address of the central server is not fixed.

        Check whether the central IP address is a fixed ONE.

        The central site is added or the port number is incorrect.

        Check whether the site is correctly added, the remote number is correct, and the port number of the field device is the same as that of the listening port.

        The information of this measurement point is not added to the center.

        Check whether the server software correctly adds this detection point information.

        Firewall block.

        Set the firewall access rules.

         

         

         

         

         

         

         

         

         

         

         

         


        Online
        聯(lián)系方式

        熱線電話

        18739187123

        上班時(shí)間

        周一到周五

        公司電話

        0391-7588881

        国产V精品一区二区三区,亚洲另类国产欧美一区二区,国产精品嫩模大尺度视频,四虎国产精品永久地址49

          <em id="aepuz"><em id="aepuz"></em></em>
            <strong id="aepuz"><dl id="aepuz"></dl></strong>